Home Blog Railcar mover daily checklist

Railcar mover daily checklist

A railcar mover works alone, so a failed hose or worn rail wheel stops the whole siding. A five minute check before the first move catches most of it. This list works for Trackmobile, Shuttlewagon and other makes. Your operator manual and site rules come first.

Before starting

After starting

Write it down

Record each check with the date, hours and the operator's name. A defect that affects safe operation is repaired before the machine works.

Who regulates a plant siding

In British Columbia, Technical Safety BC regulates railways that operate only inside the province, including industrial railways and industrial sidings and spurs. It has also issued a safety advisory on car mover weight transfer systems and on employees working between equipment. Other provinces have their own rules, so check which regulator covers your siding.

Parts worth keeping on the shelf

Older movers are the hard ones. If the maker no longer lists a part, send the model and serial number with a photo. Railcar mover parts are listed by system, and anything else can be added to an RFQ by description.